Follow us

OUR WORKSIndustrial Maintenance and construction, offshore and harbor works

MVIA1 PRODUCTION FACILITIES PROJECT

MVIA1 PRODUCTION FACILITIES PROJECT

On shore Oil production construction concerned by Process Piping works and Site Installation including civil work (Concrete Base supporting installations). Storage Tanks construction and fire fighting process equipments installation.

REVAMPING COL TUBING UNIT PERENCO OIL AND GAS CAMEROUN

REVAMPING COL TUBING UNIT PERENCO OIL AND GAS CAMEROUN

Full Maintenance of different parts of the Equipment: Power pack, Reel, Control Room and Injector; All damaged elements of process replaced by genuine parts supply by Manufacturer PACT. Repairs of damages on the structure, Paint and off shore installation for testing.

PARAGON L782 FLAG PROJECT

PARAGON L782 FLAG PROJECT

Workshop piping work including NDT, sandblasting and paint. Site Work Installation consist in: remove old line to replace by new one, Ditch valve construction and installation, Coriolis Flow meter installation and instrumentation work to enable process good operation.